AEstudio.info

Architectural Engineering program, The University of Texas at Austin

Mechanical Lecture Notes

leave a comment »

Thank you again to Shawn Allen (Jose Guerra Inc., Consulting Engineers) for his Mechanical Systems brainstorming session 2 weeks ago.

See notes:
(courtesy of Fred Gonzalez TTh)
MechParking

MechCoolingTower

MechResTower

Also:
– Main Electric Room for entire complex to be: 20′ x 50′, at ground floor.
– Electric transformers/pads to be outside, or encased in the building – must be above flood plain!
– Secondary Electric rooms to be on each floor, appx. 10×10 or as small as 5×10 in residential tower.

Advertisements

Written by Gregory Brooks

March 18, 2014 at 9:11 pm

Posted in Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: